Garage Door Standards

All new garage doors must receive ACC Approval.
From Section 13 of the 2025 updated House Rules: 

  1. Exterior Paint
    • Exterior paint colors are limited to earth tones to preserve the aesthetic appearance of the community.
      • See External source here for examples of earth tones 
      • Whether a paint sample is considered an earth tone is left to the discretion of the ACC/Board 
    • Paint samples must be submitted with a signed ACR Form (see website) to process and approve the request
      • An ACR request must be submitted for exterior paint whether the homeowner is changing the color or not. 
      • A paint sample is not required if the exact same existing color is maintained – just the ACR Form. 
    • The Board does reserve the right to deny an existing color to maintain the architectural integrity of the  neighborhood. 
    • Under normal circumstances the Board has 30 days to process your request. 
  2. Garage Doors
    • Garage doors can be of metal or wood material. 
    • The garage door must have horizontal or vertical lines that maintain the architectural integrity of the  neighborhood. No geometric designs will be permitted that can be viewed from the street.
    • If a homeowner chooses to add a window upgrade, the windows must be frosted glass. No clear or colored glass is permitted. 
    • The color of the garage door must be approved. 
    • Any major dents (over six (6) inches in length) in a metal door, broken or cracked glass in a door or windows, visible cracked or broken wooden boards, and/or garage doors with visible tilt must be  repaired within 30 days of damage. If repairs are not completed within stated time, the homeowners will be  subject to a progressive fine (in accordance with the Enforcement paragraph detailed in section 12) until repairs are completed.
    • Homeowners must include in the ACR request, pictures of the garage door, windows and a paint color sample  before the Board can process your request. 
    • Under normal circumstances the Board has 30 days to process your request.